Viewing 1 post (of 1 total)
  • Author
    Posts
  • #12251
    Akshaya Jeenraj
    Participant

    When building a bridge, outcome is generally predictable because our existing knowledge is sufficient. However, in material synthesis, more experiments are required since the results cannot always be predicted with accuracy.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.
Scroll to Top